• For Gas Emergencies: 800-888-3982
  • Search
 
Informational Postings

  • Capacity
    • Operationally Available
    • Unsubscribed
    • Design
    • Open Offers
  • Gas Quality
    • Gas Quality Provisions
    • Daily Gas Quality Report
    • Hourly Gas Quality Report
    • GQ Standards/Methods
  • Index Of Customers
  • Notices
    • Critical
    • Non - Critcal
    • Planned Service Outage
    • Waste Heat
    • Supported Price Indices
  • Posted Imbalances
  • Standards of Conduct
    • Affiliate Names and Addresses
    • Affiliate Tariff Waivers
    • Chief Compliance Officer
    • Employee Transfers
    • Implementation Procedures
    • Information Disclosure
    • Job Titles & Descriptions
    • Potential Mergers
    • Shared Facilities
    • Voluntary Consent
  • Tariff
    • Title Sheet/Section
    • Table of Contents
    • Preliminary Statement
    • Map
    • Currently Effective Rates
    • Rate Schedules
    • General Terms and Conditions
    • Form of Service Agreement
    • Entire Tariff
    • Sheet/Section Index
  • Transactional Reporting
    • Firm
    • Firm - Capacity Release
    • Interruptible
  • Location Report
  • Gas Electric Communications
  • Downloads
  • Search
    • Entire Tariff
    • Rate Schedule
    • General Terms and Conditions
    • Form of Service Agreement
  • Customer Activities
  • Site Map
 
 

Waste Heat Recovery

Download Waste Heat Recovery Compressor Listing.pdf


 

 

Gas Turbine Compressor Stations

 

The following Iroquois gas turbine compressor stations meet the dual requirements of having a total gas turbine capacity of at least 15,000 hp and operating 5,250 hours or more per year (60 percent load factor) based upon the previous years operational data (2012):

 

·         Brookfield

 

Compressor stations that either have waste heat recovery units already installed, or have projects that are currently under development or construction, are not included.

 

 

 

Background Information

 

This information is being posted to meet one of the voluntary requirements of INGAA’s February 2008 whitepaper on Waste Energy Recovery Opportunities for Interstate Natural Gas Pipelines.

 

Recovering waste heat and generating electricity from the hot exhaust gas of gas turbines located at pipeline compressor stations is seen as a way to promote increased energy efficiency and reduce green house gas emissions.  Pipeline companies with facilities in the United States, in concert with the Interstate Natural Gas Association of America (INGAA), have considered ways of expediting the development process for compressor waste heat recovery projects.  As a result of those considerations, a number of pipeline companies have agreed to identify, on a voluntary basis, gas turbine compressor stations on their systems that:

•          Have a total gas turbine station capacity of at least 15,000 hp; and

•          Operated at or more than 5,250 hours per year (60 percent load factor) over the previous 12 months.

 

Additional information may be provided to third-party waste heat developers upon request, subject to certain conditions and the execution of a confidentiality agreement.  For more information, please contact Rob Perless, Project Development Manager, at (203) 944-7016.

 

 
© 2013 Iroquois Gas Transmission System, LP. All Rights Reserved. Privacy Policy Legal Notice
One Corporate Drive, Suite 600, Shelton, CT 06484. Phone 203-925-7200
For Non-Emergencies: 800.253.5152